Kariangau BayBALIKPAPAN · ID
Concept visualisation of the Kariangau Bay industrial and port estate with quay, warehouses and estate road Concept visualisation (AI) – not a photograph
Waterfront industrial & port site · East Kalimantan

A port estate on Balikpapan Bay

43,047 m² of titled dry land running from Jl. Sultan Hasanudin to the Kariangau shipping lane, with a master plan for two quays, warehouses and offices already drawn.

LAT -1.20922LON 116.81425KEL. KARIANGAUKEC. BALIKPAPAN BARAT
43,047 m²
dry land, one continuous site
6
plots: 4 Hak Milik + 2 BPN surveys
2
quay zones in the master plan
±12,550 m²
planned warehouse & office floor area
Location

On the Kariangau shipping lane

The site sits on the west shore of Balikpapan, between an established industrial cluster to the north and the shipyards to the south, facing the lane used by vessels to Penajam and Mamuju.

Satellite view of Kariangau with the site circled between the industrial estate and the shipyards
Approximate position. Exact boundaries follow the BPN plots below.
  • NorthPT BUMA Rebuild Center Kariangau (mining heavy-equipment maintenance)
  • SouthNeighbouring frontage already reclaimed and used for berthing; shipyards
  • EastJl. Sultan Hasanudin, public road access
  • WestBalikpapan Bay and the Kariangau shipping lane
  • AreaKariangau Industrial Estate, KKT container terminal, Kariangau ferry port, Pertamina Balikpapan refinery
The land

Six plots, one road-to-sea site

Four plots carry Hak Milik (freehold) certificates registered with BPN, Indonesia's land agency. Two further plots are covered by 2004 BPN survey certificates recording dry land.

PlotDocumentTitleAreaRole in plan
123NIB 02733Hak Milik6,557 m²Road frontage – entrance, offices L1, warehouse A
125NIB 02944Hak Milik3,385 m²Centre – warehouse B
122NIB 02942Hak Milik8,270 m²Waterfront – warehouse C and open storage
124NIB 02943Hak Milik12,975 m²Waterfront, next to PT BUMA – warehouses D–E and workshop
M.701SU 14/Kariangau/2004Dry land5,930 m²PORT 1 – quay and container yard
M.703SU 16/Kariangau/2004Dry land5,930 m²PORT 2 – quay and general cargo
Total43,047 m²
BPN map of plot NIB 02733
NIB 02733 · 6,557 m²
BPN map of plot NIB 02944
NIB 02944 · 3,385 m²
BPN map of plot NIB 02942
NIB 02942 · 8,270 m²
BPN map of plot NIB 02943
NIB 02943 · 12,975 m²

Source: BPN “Sentuh Tanahku” official app. Final areas follow BPN measurement at transaction.

Master plan

The estate is already designed

A 10 m estate road runs from the Jl. Sultan Hasanudin gate to two quay zones on the bay. Five lots between them take offices, warehouses and a workshop. The plan adapts to each buyer's or tenant's needs.

Master plan sketch over satellite image showing PORT 1, PORT 2 and lots L1 to L5
Sketch over satellite image: estate road (grey), buildings (dark grey), quays (blue), port platforms (beige), BPN plot boundaries (white).
PORT 1 · M.701Quay, container yard, port office4,436 m²
PORT 2 · M.703Quay, general cargo, operations office4,407 m²
L5Warehouses D–E and workshop11,054 m² · ±5,400 m² bldg
L4Warehouse C and open storage6,248 m² · ±2,650 m² bldg
L3Warehouse B2,615 m² · ±1,200 m² bldg
L2Warehouse A3,206 m² · ±1,300 m² bldg
L1Offices and parking at the gate2,257 m² · ±2,000 m² floor
Vision

What the estate becomes

Concept visualisations of the completed estate, and the 3D land model the plan was built on.

Concept visualisation of the quay with cargo ships, cranes and containers
Quay zone PORT 1 / PORT 2. Concept visualisation (AI), not a photograph.
Concept visualisation of the estate road lined with warehouses
10 m estate road. Concept visualisation (AI).
3D model of the site seen from the sea with platform and quay
3D land model seen from the bay: waterfront platform and quay.
Sale strategy

Offered as one site first

The owner's priority is to sell the entire 43,047 m² in one transaction. If no whole-site agreement is reached, the plots will be offered individually. As a last stage, the owner will develop the estate and sell or lease the units.

Priority · now

The whole site

All six plots, 43,047 m² from road to sea, with the master plan, 3D model and documents. Letters of intent are open until 31 October 2026.

Stage 2

Plot by plot

If the site is not sold as a whole: individual plots or packages, such as the waterfront (±33,105 m²) or the roadside (±9,942 m²).

Stage 3

Developed units, sale or lease

If plots remain: the owner builds the estate and sells or leases warehouses, offices, open yards and quay space, lot by lot.

Interest in stages 2 and 3 can be registered now. Those requests are answered once the whole-site round has closed.

Hak Milik can be held by Indonesian individuals. Companies, including foreign-owned PT PMA, acquire HGB (right to build) through the standard BPN process.

Why Balikpapan

Demand the site is built for

RDMP

Refinery and energy

Pertamina's Balikpapan refinery upgrade and the oil, gas and mining service chain draw suppliers that need yards and quays.

±5%

A growing economy

Indonesia grows about 5% a year (IMF forecast 5.1% for 2026). Supply chains moving into Southeast Asia raise demand for waterfront industrial land.

IKN

Gateway to the new capital

Balikpapan is the logistics gateway to Nusantara via the Balikpapan–Samarinda toll road and its ports.

Balikpapan asking rents, 2026Rp / m² / month
Modern warehouse, Kariangau industrial zone65,000 – 85,000
Standard warehouse, city45,000 – 60,000
Open yard / laydown25,000 – 35,000

Source: Brighton.co.id listings, September 2026. Indicative asking prices.

Process

How to take a position

For the whole site, send a written letter of intent. Shortlisted parties receive the full information memorandum, certificates, survey documents and the 3D model, and are invited to a site visit.

Letters of intent until31.10.2026
  1. Letter of intent

    Identity, chosen option, price or lease terms, payment structure, proof of funds, intended use.

  2. Documents and site visit

    Full memorandum, BPN certificates, survey certificates, master plan and 3D model.

  3. Negotiation

    Sale and purchase agreement (PPJB), lease or partnership agreement.

  4. Due diligence and deed

    BPN and zoning checks, then the deed before a PPAT land notary.

Contact

Request the memorandum

Available in Bahasa Indonesia, English and Korean.

Emailinfo@kariangaubay.com
WhatsApp+62 813 462 8435wa.me
Site addressJl. Sultan Hasanudin, Kel. Kariangau, Kec. Balikpapan Barat, Kota Balikpapan, Kalimantan Timur, Indonesia

Your request opens in your email app, addressed to info@kariangaubay.com.